- SNARL locker inventoried and cleaned up
- Tipping bucket replacement completed
- Lysimeters cleaned
- Added additional camera tour stops + optical image stabilization for webcam
- Raritan installed on Nube (VZ400 Stealth) and running
- Improved remote desktop access for CUES mini
- Arduino upgraded
- Replaced pivots and added 4 additional guy wires to adj albedo arm to prevent bending
- Cables spliced and fixed that were damaged over sharp edge at end of arm
- Sommer fluidless SSG-2 snow pillow installed
- Thousands of feet of spare cable removed from bunker and moved to SNARL locker
- BSU Infrasound array installed for winter of 2024
- Database queries checked and verified
- CIMEL checked and working with Aeronet
- DRI SP2 spring sampling for carbon and dust planned
- 2025 TLC plans: 4” conduit junction CDEC data acquisition Soil moisture, temp, radiometer sensor calibration