Installed Irgasons at 2 levels: (1) replacing DH20 on adjustable boom, (2) top of platform above RM Young.
Pulled data cable from depth sensor above pillow. Replaced and re-dug the conduit.


Installed Irgasons at 2 levels: (1) replacing DH20 on adjustable boom, (2) top of platform above RM Young.
Pulled data cable from depth sensor above pillow. Replaced and re-dug the conduit.