Author Archives: Mike Colee

CUES TLC 2023

  • Installed 2x Irgasons at 2 heights
  • Replaced KH20 on adjustable boom+ RM Young 81000
  • Pulled data cable from depth sensor above pillow
  • Leveled on all instruments due to platform damage
  • Platform repairs performed by MMSA
  • New Panasonic webcam installed, streaming set up on Youtube
  • Webcam dome cleaned
  • Judd on remote boom wiring repaired
    New 2″ conduit installed to remote boom
  • 4″ conduit installed throughout site on east side
  • SHM31 wind mast moved to adjustable boom, replaced Wit Motion accelerometer
  • Raritan installed
  • Tipping bucket replacement, pending
  • Parsivel switched to PC
  • Loggernet switched to PC
  • Cabling re-routed and cleaned up throughout site
  • All instrument output checked
  • KH20 sent back to Campbell
  • Logger wiring diagrams re-written
  • Lysimeters vacuumed and cleaned
  • Pluvio2 at Sesame recharged
  • Snow pillow at Sesame needs to be repaired by DWR, pending
  • Logger #2 given 6 AMP power supply to address power drain issues
  • Backend and front-end database updated
  • Mac and PC updated
Conduit layout for west side of platform
Conduit layout for east side of platform