- SNARL locker inventoried and cleaned up
 - Tipping bucket replacement completed
 - Lysimeters cleaned
 - Added additional camera tour stops + optical image stabilization for webcam
 - Raritan installed on Nube (VZ400 Stealth) and running
 - Improved remote desktop access for CUES mini
 - Arduino upgraded
 - Replaced pivots and added 4 additional guy wires to adj albedo arm to prevent bending
 - Cables spliced and fixed that were damaged over sharp edge at end of arm
 - Sommer fluidless SSG-2 snow pillow installed
 - Thousands of feet of spare cable removed from bunker and moved to SNARL locker
 - BSU Infrasound array installed for winter of 2024
 - Database queries checked and verified
 - CIMEL checked and working with Aeronet
 - DRI SP2 spring sampling for carbon and dust planned
 - 2025 TLC plans: 4” conduit junction CDEC data acquisition Soil moisture, temp, radiometer sensor calibration
 