  • SNARL locker inventoried and cleaned up
  • Tipping bucket replacement completed
  • Lysimeters cleaned
  • Added additional camera tour stops + optical image stabilization for webcam
  • Raritan installed on Nube (VZ400 Stealth) and running
  • Improved remote desktop access for CUES mini
  • Arduino upgraded
  • Replaced pivots and added 4 additional guy wires to adj albedo arm to prevent bending
  • Cables spliced and fixed that were damaged over sharp edge at end of arm
  • Sommer fluidless SSG-2 snow pillow installed
  • Thousands of feet of spare cable removed from bunker and moved to SNARL locker
  • BSU Infrasound array installed for winter of 2024
  • Database queries checked and verified
  • CIMEL checked and working with Aeronet
  • DRI SP2 spring sampling for carbon and dust planned
  • 2025 TLC plans: 4” conduit junction CDEC data acquisition Soil moisture, temp, radiometer sensor calibration