- Installed 2x Irgasons at 2 heights
- Replaced KH20 on adjustable boom+ RM Young 81000
- Pulled data cable from depth sensor above pillow
- Leveled on all instruments due to platform damage
- Platform repairs performed by MMSA
- New Panasonic webcam installed, streaming set up on Youtube
- Webcam dome cleaned
- Judd on remote boom wiring repaired
New 2″ conduit installed to remote boom - 4″ conduit installed throughout site on east side
- SHM31 wind mast moved to adjustable boom, replaced Wit Motion accelerometer
- Raritan installed
- Tipping bucket replacement, pending
- Parsivel switched to PC
- Loggernet switched to PC
- Cabling re-routed and cleaned up throughout site
- All instrument output checked
- KH20 sent back to Campbell
- Logger wiring diagrams re-written
- Lysimeters vacuumed and cleaned
- Pluvio2 at Sesame recharged
- Snow pillow at Sesame needs to be repaired by DWR, pending
- Logger #2 given 6 AMP power supply to address power drain issues
- Backend and front-end database updated
- Mac and PC updated